The header image is the default header image for the site.

Jefferson College to Replace Pedestrian Bridge

Jefferson College to Replace Pedestrian Bridge

Date Posted: January 2, 2024

Posted In: News, Organizations, People, Projects, Regionalism,

From Leader Publications:  The pedestrian bridge on Jefferson College’s Hillsboro campus is expected to be replaced over the summer.

Members of the Jefferson College Board of Trustees voted unanimously Dec. 7 to award a $558,390 contract to Brockmiller Construction in Farmington to demolish the existing bridge and build a new one to replace it. The company approved the lowest of six bids for the project.

The bridge spans the main roadway through the campus and connects the area near the Red Parking Lot between the Early Childhood Center and the Field House and the area near the Student Center.

College President Dena McCaffrey said the bridge needs to be replaced because of its age, not because of concerns that it can’t bear the weight of pedestrians walking on it.

“The current pedestrian bridge is over 50 years old,” she said. “Although the bridge is not considered unsafe, it is in need of some safety improvements, including higher fencing and better railings. It will also meet today’s standards of accessibility.”

John Linhorst, interim senior director of operations, said the ramp to the current bridge doesn’t meet Americans with Disabilities Act standards.

“(Those standards) require a more gradual slope than the current ramp has,” he said.

Linhorst said work on the bridge replacement is scheduled to start after classes end this spring and be completed by August when classes resume for the fall semester.

“There are two parts to the bridge project,” he said. “The demolition will be after commencement (in May). The bridge will be manufactured off site and brought in. They anticipate it will be ready for the (fall) semester.”

Read more.

 

Signup For Our Newsletter

Newsletter Sign Up - Vertical - ACTIVE
Name
Name
Translate »
Secret Link